How much extra stock to hold, when to reorder, and — the part most calculators skip — what each extra point of service level actually costs you to carry. Everything runs in your browser; nothing you enter leaves this page.

Demand

?
units sold or consumed per day
?
standard deviation of daily demand, in units

Supplier

?
days from placing an order to having it on the shelf
?
standard deviation of lead time, in days

Target

?
% of replenishment cycles with no stockout

Cost

?
?
storage, capital, insurance, shrink — as % of unit cost per year. 20–30% is typical.
?
admin, receiving and inbound fees per PO — sets the order quantity
Reorder point · Min ? — units
Safety stock ? — units
Order qty (EOQ) ? — Max — ?
Safety stock cost ? — per year to carry

    What service level costs to hold

    annual carrying cost of safety stock, by service level

    By service level

    Service levelzSafety stockReorder pointCost / yr

    What each number means

    Tap any in the calculator to jump to its explanation here.

    What you enter

    Average daily demand

    How many units you sell or use on a typical day.

    Where to find it: units sold over the last 90 days, divided by 90. 1,080 units in 90 days = 12 a day.

    ↑ back to the calculator
    Demand variability

    How much daily sales swing around that average. A small number means steady sales; a big one means some days you sell 2 and some days 25.

    Where to find it: put daily sales in a spreadsheet column and use =STDEV(). No daily data? Start with about a third of the average for a steady product, or the full average for a lumpy one.

    ↑ back to the calculator
    Average lead time

    Days from placing an order to having the stock ready to sell. Count all of it: production, shipping, customs, and check-in at the warehouse.

    Example: 14 days to make + 5 in transit + 2 to receive = 21.

    ↑ back to the calculator
    Lead-time variability

    How much delivery time swings from one order to the next. Shipments that always land within a day or two of plan: small. Shipments that are sometimes a week late: large.

    Where to find it: =STDEV() of the actual lead times on your last several orders.

    ↑ back to the calculator
    Service level

    How often you are willing to run out. At 95%, about 1 in every 20 reorder cycles runs out before the next delivery arrives. Higher is safer, but each step up costs more to hold — the chart shows how much.

    ↑ back to the calculator
    Unit cost

    What one unit costs you to buy and get into your warehouse — including freight and duty. Not what you sell it for.

    ↑ back to the calculator
    Annual holding cost

    What it costs to keep one unit on the shelf for a year, as a percentage of what the unit cost you: storage space, cash tied up that could be used elsewhere, insurance, damage and loss.

    Don't know it? 20–30% is the usual assumption.

    ↑ back to the calculator
    Cost per order

    The fixed cost of placing one order, whatever its size: time to prepare it, receiving fees, per-shipment charges. High order costs push you toward fewer, bigger orders.

    ↑ back to the calculator

    What you get

    Reorder point (Min)

    When stock on hand drops to this number, place the next order. It covers what you'll sell while waiting for the delivery, plus the safety stock.

    ↑ back to the calculator
    Safety stock

    Extra units kept on hand for the surprises — a busy week, a late shipment. You don't plan to use it; it's there so a bad week doesn't become a stockout.

    One limit: for items that only sell a few times a year, this calculation tends to hold too little. Those need a different method.

    ↑ back to the calculator
    Order quantity (EOQ)

    How many units to order each time so that the cost of ordering and the cost of storing are, together, as low as possible. EOQ stands for economic order quantity.

    ↑ back to the calculator
    Max

    The most stock you should have — right after a delivery arrives. It's the reorder point plus one order. If you're regularly above it, you're over-ordering.

    ↑ back to the calculator
    Safety stock cost

    What it costs per year just to keep the safety stock on the shelf. Think of it as the price of your chosen service level.